Quick answer

DC charging site planning for the EON120KW-400KW CCS2 system starts with rated power selection from 120 to 400 kW, an operating range of -25°C to 65°C with derating above 50°C, and OCPP 1.6J or 2.0.1 backend integration.

Site planning

A better brief for a better charging site

Six planning checks bring vehicles, site power, installation and communications into the same conversation.

03

Site planning

CCS2 DC fast charging system · EON120KW-400KW

Site worksheet

Decision summary

The planning brief at a glance

AreaPrepareConfirm with
VehiclesDuty cycle, parking plan and charging windowsFleet operator
Electrical & physicalAvailable supply, layout and service accessQualified local designer
OperationsNetwork, backend and payment requirementsEquipment supplier and operator

This is a planning aid. Installation design uses the current model documents and local engineering review.

Vehicles and operating windows

Map arrival times, parking positions and the available charging windows. Compare the required energy with site supply and the proposed power-sharing arrangement. Vehicle charging capability and battery state also affect session duration.

Electrical supply and physical layout

For the CCS2 range, the listed enclosure is W800 × D650 × H1700 mm. Review the chosen power option with the local designer, including supply, protection, cable routes, vehicle approach and service clearances. Use current installation drawings for the selected configuration.

Temperature and available output

The CCS2 operating range is -25°C to 65°C, with derating above 50°C. Give the supplier the expected ambient conditions and request the relevant output and ventilation requirements. The upper operating limit does not promise full rated output.

Connectivity and payment

The CCS2 family lists Ethernet, GSM and 4G communications, with OCPP 1.6J and 2.0.1 backend protocols. Confirm network coverage, the selected backend and integration testing. QR code, RFID and NFC are listed; credit card is optional and requires regional arrangements.

Local work and interfaces

The project plan should identify equipment, electrical and communication interfaces, and the work assigned to each party. Review it with the local electrical, civil and network teams before installation.

Commissioning and handover

Agree who checks the electrical installation, device configuration and backend connection. Include the commissioning record, installation documents, training scope and escalation contacts in the handover package.

Bring a usable project brief

The checklist below brings the planning inputs together. Items that remain unknown can be marked for discussion; detailed electrical and civil design still requires the current equipment documents and qualified local review.

Project worksheet

Your site-planning checklist

Tick the items you have prepared. Print the list for a project meeting; the selections remain only in this open page.

Your site-planning checklist

Continue with a related guide

AC, DC or mobile?CCS2 and GB/TConnect equipment and operations

Frequently asked questions

What rated power options are available for DC fast charging?

The EON120KW-400KW CCS2 DC fast charging system is offered in rated power options of 120, 160, 200, 240, 320, 360, and 400 kW. Site planning should match the selected power level to the expected vehicle mix and electrical supply capacity.

What ambient temperature range should site planners design for?

The system operates from -25°C to 65°C, with derating required above 50°C. Planners in hot climates should account for this derating condition when sizing power and ventilation for the enclosure.

Which EV and backend protocols does the charger support?

The charger supports ISO15118 and DIN70121 EV protocols plus OCPP 1.6J and OCPP 2.0.1 backend protocols. These protocol details should be confirmed against the site's network and vehicle requirements during planning.

What footprint does the charging unit require on site?

The unit measures W800 x D650 x H1700 mm, so planners should reserve space for the cabinet plus clearance for access and cable management. Confirm final clearances against local installation requirements before construction.

How can drivers pay at the charging station?

Payment options include QR code, RFID, NFC, and optional credit card. Site planners should decide which payment methods suit the local market and confirm the optional credit card feature during specification.

What communication options are available for site connectivity?

Communication is available via Ethernet, GSM, and 4G, supporting backend connection through OCPP 1.6J or 2.0.1. Planners should verify network coverage at the site for the chosen communication path.

What display and language support does the charger offer?

The charger has a 7-inch display and supports languages including English, French, German, and Turkish. Language selection should be confirmed against the target driver population during site planning.

Talk to us about your project

Tell us which product you are considering and where it will be used.

Lingxiu Yungu, No. 699 Yunli Road, Jiangling Sub-district, Wujiang District, Suzhou, China

We use your contact details to respond to this enquiry.

Your enquiry will be sent to our team.

Project enquiry ↗

Website information assistant

Ask about information on this site. Prices, certifications and project feasibility require confirmation from the team.

Privacy

Do not include personal or confidential information. Your question is processed by an AI service to select website information. This conversation is not saved in the site history. Enquiries to the team are sent separately.

Open original