Decision summary
Three formats, different planning needs
| Format | Listed equipment | Plan around |
|---|---|---|
| AC charging | 7 kW · GB/T · EON220/32-1 | Vehicle AC capability and parking time |
| CCS2 DC | 120–400 kW · 200–1000 V | Site supply, vehicle demand and output allocation |
| Mobile storage | 208 kWh nominal · up to 90 kW DC | Usable energy, recharge time and safe movement |
Power and capacity are different quantities. Actual charging performance depends on the vehicle, configuration and operating conditions.
Start with the charging task
List the vehicles and their charging interfaces, how long they stay parked and the power available. For mobile charging, add the locations and frequency of movement. These details narrow the equipment choice before a power rating does.
AC charging for longer parking windows
The EON220/32-1 is a 220 V, 7 kW AC charger with a GB/T connector. Match it to the vehicle inlet and onboard AC charging capability. For a location with longer dwell times, confirm the mounting, cable arrangement and electrical supply with the installation team.
DC charging: match power and allocation
The CCS2 family offers 120, 160, 200, 240, 320, 360 and 400 kW options with a 200–1000 V output range. Two connectors do not by themselves establish simultaneous full-power charging. Request the output allocation for the selected configuration and check it against vehicle demand.
Mobile storage: plan charging and recharge
The EON-MS-208/90-A has 208 kWh nominal storage, single-gun DC output up to 90 kW and 250 A, and AC recharge up to 60 kW. Plan the charging task together with the time and supply needed to replenish the battery. Actual energy delivered to vehicles depends on operating conditions.
Keep power and energy separate
Power describes the rate of energy transfer; storage capacity describes an amount of energy. Evaluate the vehicle charging limit, available site supply and charging window alongside both values. A larger cabinet rating alone cannot guarantee a shorter session.
Prepare the equipment discussion
Send the project country, vehicle list, charging windows and known supply conditions. Include the intended connector, backend and payment method where known. We can then discuss a model-specific configuration and identify the documents still needed.